Services

Designs proven on a twin before you buy a single switch.

Datacenter, campus and WAN architecture from requirements to a bill of materials — topology, addressing, protocols, segmentation and failure behaviour — validated in simulation and delivered as code and drawings.

What's included

01

Requirements and constraints

Workloads, growth, resilience targets, compliance, budget and the hardware you already own.

02

Topology and protocol design

Spine-leaf VXLAN EVPN, EVPN campus, SD-WAN overlays; BGP underlays, ECMP, multihoming, QoS.

03

Segmentation and security model

VRFs, VNIs, group-based policy and firewall insertion defined once and carried through every domain.

04

Capacity and oversubscription

Port counts, uplink ratios, optics and cabling plans sized for the next refresh, not just today.

05

Twin validation

The design built in Containerlab or the vendor's lab, failure cases exercised, reachability proven.

06

Deliverables

Drawings, BOM with part numbers, IP plan, configuration templates in a repository you own.

How an engagement runs

01

Discovery

Requirements and current state. One to two weeks.

02

Design

Architecture, low-level design, BOM. Two to four weeks.

03

Validation

Twin built, tests run, findings folded back into the design.

04

Handover

Design package and repository; optional build and migration follow-on.

Questions we get asked

Vendor-neutral or do you push one?

Multi-vendor by design. We hold expert certifications on Juniper, Cisco and Arista and recommend based on the workload and your team's skills.

Can you work from a vendor's reference design?

Yes, and we will tell you where the reference design does not fit your estate.

Request a quote

Tell us about the project; a senior engineer responds the same business day.

Related
Reviewed by a senior engineer, not a sales queue.

Have a fabric to design?

Talk to an engineer