Fast wired workstations
Gigabit or 10-gigabit to CAD and BIM seats, with the switch and cabling to match, so Revit models and drone photos load quickly.
CAD, BIM and photo-heavy project folders need a fast wired network and storage designed for large files, while estimators, PMs and job-site trailers need to reach the same plan room from wherever the work is. We build the office network, the file storage and the site connectivity, and back up the project record.
On site in Frisco, Plano, McKinney, Allen, Prosper, Little Elm, The Colony, Carrollton, Richardson and Dallas · remote support across Texas
| Project records | Contracts, change orders and daily logs are evidence years later. Backups with retention that outlasts the warranty period. |
|---|---|
| Client and GC requirements | Larger clients ask subcontractors about security and data handling; a documented setup answers the questionnaire. |
| Software licensing | Autodesk, Bluebeam and Procore licences are expensive — we keep them inventoried and assigned so you pay for what you use. |
Gigabit or 10-gigabit to CAD and BIM seats, with the switch and cabling to match, so Revit models and drone photos load quickly.
A NAS or file server for large active files, synced to SharePoint or the project platform for sharing and remote access.
Secure remote access for PMs and estimators; Procore, Bluebeam Studio or Autodesk Construction Cloud integrated with the office files.
LTE/5G or satellite routers, Wi-Fi for the trailer and the site, cameras for progress and security — delivered and configured before mobilisation.
Project folders, email and accounting backed up with retention set by project, not by chance.
Separate networks for staff, guests and conference rooms; a cloud phone system that reaches field staff.
We set the network up to each vendor’s published requirements and we talk to their support in their language, so you are never the go-between.
Every industry page above is built from the same six services — quoted after a free site visit, installed after hours, documented so you are never stuck with one vendor.
A Prosper general contractor's estimators waited minutes for Revit models from a shared PC, and new job sites went weeks without internet. We installed a 10-gigabit wired network to the CAD seats, a NAS synced to SharePoint for remote project managers, Procore integration, and pre-configured LTE/5G routers that ship to each trailer.
Representative engagement · Prosper · 4 job sites · 2026 · client name available on request
All small-office case studiesScope · 18 office staff, 5 CAD seats, 4 active job sites
Result · model open time from minutes to seconds; trailers online the day they land
Delivered · NAS and backup, remote access, trailer kits, licence inventory
Timeline · three weeks for the office, one day per trailer
Active CAD and BIM files are faster on a local NAS; sharing and remote access work better in the cloud. Most offices end up with both, synced.
LTE/5G in a day if there is coverage; satellite within a week. We ship the router pre-configured.
Tell us about the office — how many people, what is slow or broken, what you are planning. A senior engineer who has set up construction and engineering offices before calls the same business day to set a time.
Prefer to talk? +1 (469) 252-8666